Working condition introduction
The hardness of the saline soil is low, and it is recommended to choose an Mono-arm ripper to dig deeper.
Weathering degree:
Solution
1. Working Conditions
Saline Soil: rich in soluble salts, white to gray-white, salt crust or salt frost layers on surface, salt content 1%-10%. Structure loose, hardness <20MPa, soft rock to very soft rock. Low excavation resistance but high corrosiveness to metal equipment.
Mono-arm ripper (C Series) is recommended for soft, high-corrosion saline soil. Integrated structure is flexible with controllable excavation force, effectively reducing corrosion risk while protecting resource integrity.
2. Recommended Equipment
Model | Excavator Tonnage | Application | Core Advantages |
CSJ400C | 40-65t | Surface stripping, salt crust breaking | Compact, flexible, coastal environment |
CSJ700C | 65-85t | Medium-to-large mine face large-scale stripping | High output, best cost-performance |
CSJ900C | 85-95t | Deep saline soil, high salt content areas | Strong penetration, wear-resistant, continuous heavy-duty |
CSJ1200C | 120t | Super large mine, high-intensity continuous operation | Extra-large working radius, highest single-shift output |
3. Production Rate
Soil Hardness | CSJ400C (40-65t) | CSJ700C (65-85t) | CSJ900C (85-95t) | CSJ1200C (120t) |
5-12MPa (soft soil) | 250-300m³/h | 280-340m³/h | 320-380m³/h | 360-420m³/h |
10-18MPa | 200-250m³/h | 230-280m³/h | 270-320m³/h | 310-370m³/h |
15-22MPa | 160-200m³/h | 190-240m³/h | 230-280m³/h | 270-330m³/h |
18-25MPa | 130-170m³/h | 160-210m³/h | 200-250m³/h | 240-290m³/h |
Reference data from Mono-arm ripper field tests. Hardness generally 5-20MPa; C Series fully capable.
4. Construction Process
· Saline Soil Survey: Confirm layer thickness, salt content distribution, groundwater level, and soil structure; select model and corrosion protection plan
· Corrosion Protection: High salt content is highly corrosive; apply anti-corrosion coating on key parts and install protective sleeves on hydraulic lines before mobilization
· Surface Stripping: Use the ripper to loosen surface salt crust, expose underlying saline soil, control stripping thickness 300-500mm
· Breaking & Mining: Strip and break layer by layer along soil direction; control product size ≤300mm to avoid over-crushing that affects salt resource quality
· Sorting & Stacking: Separate high-purity and ordinary saline soil for salt chemical processing
· Drainage: Salt in saline soil leaches on contact with water; ensure drainage facilities during rainy season to reduce salt loss
5. Efficiency Comparison
Item | Traditional Excavator Direct Mining | |
Daily Output (8h shift) | 1000-2000m³ | |
Salt Crust Breaking | Poor (high excavation resistance, hard to break) | |
Equipment Wear | High (severe wear from direct excavation) | |
Salt Resource Protection | Poor (over-crushing, high salt particle breakage rate) | |
Environmental Compliance | Average (dust and salt spray pollution control difficult) |
6. Construction Precautions
· Corrosion Protection is Core: High salt severely corrodes hydraulic cylinders and pins; use anti-corrosion coating and anti-rust hydraulic oil, check key parts for corrosion every 100 hours
· Working Time Selection: Salt crust hardens in high temperatures; work during cooler morning/evening hours when salt crust is relatively soft and breaking efficiency is higher
· Prevent Salt Leaching: Rainwater leaches soluble salts during rainy season; build temporary rain shelters or avoid large-scale mining in rainy season
· Model Selection: Hardness 5-20MPa; C Series fully capable, no J Series needed
· Equipment Maintenance: Flush equipment surface with clean water after each shift to remove salt deposits; shorten hydraulic oil change interval by 50% (every 150h recommended); apply anti-rust grease regularly
Construction case
Feel free to contact us for expert help

Service Introduction

Working condition diagnosis

Model matching

Call 400
The products are distributed in 700 + cities around the world, and have provided more than 3000 professional solutions for major construction projects around the world.
© 2021-2026 Sichuan Chang'an Chuanshanjia Technology Co., Ltd. all rights reserved [Shu ICP Bei No. 18030366]