Chang'an Chuanshanjia - Rock Boom Equipment
Chang'an Chuanshanjia - Rock Boom Equipment
Chang'an Chuanshanjia - Rock Boom Equipment
Saline soil-

Working condition introduction

The hardness of the saline soil is low, and it is recommended to choose an Mono-arm ripper to dig deeper.

Weathering degree:

Chang'an Chuanshanjia - Rock Boom Equipment High weathering
Chang'an Chuanshanjia - Rock Boom Equipment General weathering
Chang'an Chuanshanjia - Rock Boom Equipment Low weathering

Product manual download:Chang'an Chuanshanjia - Rock Boom Equipment

Chang'an Chuanshanjia - Rock Boom Equipment Service and support
Chang'an Chuanshanjia - Rock Boom Equipment Contact now
Consulting

Solution

1. Working Conditions

Saline Soil: rich in soluble salts, white to gray-white, salt crust or salt frost layers on surface, salt content 1%-10%. Structure loose, hardness <20MPa, soft rock to very soft rock. Low excavation resistance but high corrosiveness to metal equipment.

Mono-arm ripper (C Series) is recommended for soft, high-corrosion saline soil. Integrated structure is flexible with controllable excavation force, effectively reducing corrosion risk while protecting resource integrity.

 

2. Recommended Equipment

Model

Excavator Tonnage

Application

Core Advantages

CSJ400C

40-65t

Surface stripping, salt crust breaking

Compact, flexible, coastal environment

CSJ700C

65-85t

Medium-to-large mine face large-scale stripping

High output, best cost-performance

CSJ900C

85-95t

Deep saline soil, high salt content areas

Strong penetration, wear-resistant, continuous heavy-duty

CSJ1200C

120t

Super large mine, high-intensity continuous operation

Extra-large working radius, highest single-shift output

 

 

3. Production Rate

Soil Hardness

CSJ400C (40-65t)

CSJ700C (65-85t)

CSJ900C (85-95t)

CSJ1200C (120t)

5-12MPa (soft soil)

250-300m³/h

280-340m³/h

320-380m³/h

360-420m³/h

10-18MPa

200-250m³/h

230-280m³/h

270-320m³/h

310-370m³/h

15-22MPa

160-200m³/h

190-240m³/h

230-280m³/h

270-330m³/h

18-25MPa

130-170m³/h

160-210m³/h

200-250m³/h

240-290m³/h

 

Reference data from Mono-arm ripper field tests. Hardness generally 5-20MPa; C Series fully capable.

 

4. Construction Process

· Saline Soil Survey: Confirm layer thickness, salt content distribution, groundwater level, and soil structure; select model and corrosion protection plan

· Corrosion Protection: High salt content is highly corrosive; apply anti-corrosion coating on key parts and install protective sleeves on hydraulic lines before mobilization

· Surface Stripping: Use the ripper to loosen surface salt crust, expose underlying saline soil, control stripping thickness 300-500mm

· Breaking & Mining: Strip and break layer by layer along soil direction; control product size ≤300mm to avoid over-crushing that affects salt resource quality

· Sorting & Stacking: Separate high-purity and ordinary saline soil for salt chemical processing

· Drainage: Salt in saline soil leaches on contact with water; ensure drainage facilities during rainy season to reduce salt loss

 

5. Efficiency Comparison

Item

Traditional Excavator Direct Mining


Daily Output (8h shift)

1000-2000m³


Salt Crust Breaking

Poor (high excavation resistance, hard to break)


Equipment Wear

High (severe wear from direct excavation)


Salt Resource Protection

Poor (over-crushing, high salt particle breakage rate)


Environmental Compliance

Average (dust and salt spray pollution control difficult)


 

 

6. Construction Precautions

· Corrosion Protection is Core: High salt severely corrodes hydraulic cylinders and pins; use anti-corrosion coating and anti-rust hydraulic oil, check key parts for corrosion every 100 hours

· Working Time Selection: Salt crust hardens in high temperatures; work during cooler morning/evening hours when salt crust is relatively soft and breaking efficiency is higher

· Prevent Salt Leaching: Rainwater leaches soluble salts during rainy season; build temporary rain shelters or avoid large-scale mining in rainy season

· Model Selection: Hardness 5-20MPa; C Series fully capable, no J Series needed

· Equipment Maintenance: Flush equipment surface with clean water after each shift to remove salt deposits; shorten hydraulic oil change interval by 50% (every 150h recommended); apply anti-rust grease regularly


Construction case

Feel free to contact us for expert help

Chang'an Chuanshanjia - Rock Boom Equipment

Service Introduction

Chang'an Chuanshanjia - Rock Boom Equipment

Working condition diagnosis

Chang'an Chuanshanjia - Rock Boom Equipment

Model matching

Chang'an Chuanshanjia - Rock Boom Equipment

Call 400

Chang'an Chuanshanjia adheres to customer value orientation

The products are distributed in 700 + cities around the world, and have provided more than 3000 professional solutions for major construction projects around the world.

© 2021-2026 Sichuan Chang'an Chuanshanjia Technology Co., Ltd. all rights reserved [Shu ICP Bei No. 18030366]